Pricing
Quoted on site, not off a rate card.
Deck height, cover, access and timber all move the number. Ewan looks at the job, then writes a quote that spells out what is covered. Licence 459690C, ABN 33 795 149 261.
How a quote runs
- 1
Photos and suburb
Call, email or Instagram with a few shots of the site. Enough to tell whether it is a fit.
- 2
Measure on site
Levels, eaves, access and how the outdoor room or openings should sit against the house.
- 3
Written scope
A written quote that spells out labour, materials and what is not included.
What moves the price
Access
Tight side access, steep blocks or second-storey work change labour against a walk-up ground-level deck.
Cover
An open deck is simpler than an insulated patio roof tied into existing eaves and gutters.
Height & railing
Once a deck needs a code barrier, balustrade and post detailing add scope.
Timber & boards
Hardwood posts, composite boards and insulated roofing products are priced for what the job actually uses.
Approvals
Exempt outdoor rooms differ from jobs that need a certifier or council path.

